Pre-Construction Pier Installation in Wake Forest, NC
Making Our Clients Satisfied!
- Free Estimates
- Financing Available
- Special Discounts
What Your Neighbors Are Saying About Us
How Pre-Construction Pier Installation Works
Pre-construction piers are installed before building begins to ensure the structure’s weight is evenly distributed across stable soil layers. These piers bypass weak surface soils, preventing future settlement, cracking, and foundation movement.
Site Evaluation and Soil Analysis
- Conducting soil testing to determine load-bearing capacity.
- Identifying expansive clay, loose fill, or erosion-prone soil.
- Designing a custom pier system based on structural requirements.
Pre-Construction Pier Installation Process
1. Selecting the Right Pier Type
- Helical piers – Ideal for light to moderate structures, providing instant load capacity.
- Steel push piers – Best for heavy buildings requiring deep foundation support.
2. Installing the Piers into Load-Bearing Soil
- Hydraulically driving steel piers deep into the ground.
- Using precision alignment to ensure uniform weight distribution.
3. Verifying Load-Bearing Capacity
- Load testing to confirm piers can support expected structural weight.
- Ensuring even load distribution across all foundation points.
4. Preparing the Foundation for Construction
- After installation, the site is ready for slab pouring or framing.
- Piers remain in place, providing long-term structural stability.
Our Services
- Concrete Slab Foundation Repair
- Pier and Beam or Block and Base Foundation Repair
- Basement Wall Repair
- Basement Waterproofing
- Cracked Wall / Structural Repair
- Drainage Services and Repair
- House Leveling
- Mudjacking / Slabjacking
- Retaining Wall Repair
- Sinkhole Remediation
- Polyurethane Foam Injection
- Commercial Foundation Repair
- Mobile Homes
- Soil Stabilization
- Compaction Grouting
- Pool Stabilization
- Void Filling
- Pressed Steel Pilings
- Steel Push Pier Installation
- Slab Pier Installation
- Helical Pier Installation
- Pre-Construction Pier Installation

Benefits of Pre-Construction Pier Installation
Pre-construction piers provide permanent structural stability, preventing costly future repairs. Key benefits include:
✓ Prevents Future Foundation Settlement – Supports structures before construction begins.
✓ Deep Soil Stabilization – Bypasses weak or expansive soil layers.
✓ Minimally Invasive Installation – No need for heavy excavation or disruption to the building site.
✓ Long-Term Foundation Protection – Reduces risk of cracks, shifts, and structural damage.
✓ Ideal for Residential & Commercial Construction – Suitable for new homes, office buildings, and industrial projects.

What to Expect During Pre-Construction Pier Installation
At Wake Forest Foundation Repair, we follow a precise installation process to ensure optimal foundation support:
- Soil Testing & Structural Load Analysis
- Conducting geotechnical analysis to determine soil conditions and load capacity.
- Designing a customized pier system based on building weight.
- Pre-Construction Pier Installation
- Installing helical or push piers into load-bearing soil layers.
- Load testing to ensure each pier meets weight requirements.
- Final Site Preparation
- Preparing the foundation for slab pouring or framing.
- Ensuring piers are properly aligned for long-term support.
- Final Inspection & Structural Approval
- Verifying that the foundation system is ready for construction.
- Providing engineer-certified load calculations and reports.

Cost of Pre-Construction Pier Installation in Wake Forest, NC
The cost of pre-construction pier installation depends on several factors:
* Number of Piers Required – Larger structures need more piers for full stabilization.
* Soil Conditions & Depth to Bedrock – Soft or expansive soil may require deeper piering.
* Pier Type & Material Used – Helical piers and steel push piers have different costs.
* Project Size & Load Requirements – Heavier buildings require stronger, more numerous supports.
At Wake Forest Foundation Repair, we provide affordable pricing and financing options to ensure cost-effective foundation solutions.

Why Choose Us for Pre-Construction Pier Installation?
Wake Forest Foundation Repair is a trusted expert in pre-construction pier installation in Wake Forest, NC. Here’s why builders and homeowners rely on us:
* Certified Foundation Specialists – Experts in pre-construction foundation stabilization.
* Advanced Installation Equipment – Using state-of-the-art hydraulic piering systems.
* Cost-Effective & Long-Term Solution – Prevents expensive future foundation repairs.
*Guaranteed Results – Backed by a long-term structural stability warranty.
* Local Wake Forest Experts – Knowledgeable about regional soil conditions and construction challenges.
FAQs About Pre-Construction Pier Installation
How long does pre-construction pier installation take?
Most projects take one to three days, depending on the number of piers and soil conditions.
Are pre-construction piers necessary for all buildings?
They are recommended for structures built on expansive, loose, or weak soils to prevent future settlement issues.
What type of piers should I use for my new construction?
Helical piers are best for lighter structures, while steel push piers work well for heavier loads and deeper stabilization.
Will pre-construction piers increase my home’s value?
Yes. A home built on a reinforced foundation has greater stability and resale value.
Looking for Pre-Construction Pier Installation Near Me?
If you need pre-construction pier installation in Wake Forest, NC, trust Wake Forest Foundation Repair for expert foundation support.
Building on a weak foundation can lead to serious structural problems in the future. Contact us today for a free consultation and professional pre-construction piering services.